Project Details

  • Project Manager: Matt Hood

  • Architect: FBT Architects

  • Contractor: GH Phipps Construction

Scope of Work

​Remodels/Additions - $5,050,000

  • Create more parking

  • 10-classroom addition

Fairness Formula Projects - $556,000

The School Site Improvement Committee identified fairness formula projects — a list of recommended projects. The list will be prioritized and completed as budget allows. 

  • Audio / Visual - Theater upgrades (LED light and sound)

  • Outdoor seating (bleachers at athletic fields)

  • Exterior Improvements - Outdoor classrooms

  • Gym upgrades (floor and A/V system)

  • Furniture, Fixtures, and Equipment - Replace science lab table tops with acid / heat resistant finishes

  • Add hand dryers in bathrooms

  • Storage

Technology Infrastructure

  • Replace hardware that enables wired and wireless connections to the Internet.

  • Replace security cameras

​In Progress

Remodels/Additions

  • 10-classroom addition and parking lot: earthwork and utility relocation complete, concrete curbs and footers poured, preliminary parking lot asphalt poured, masonry and structural complete, and duct work installed. Stud wall and roofing installation finished. Roof top unit and windows to be installed next. Furniture order placed for installation in late summer 2019

Fairness Formula

  • Outdoor classrooms: furniture designs in progress and determining scope of landscape work with selected contractor. Work anticipated to be complete over summer 2019 

  • Business Enterprise Initiative space: design in progress. Work anticipated to be completed over summer 2019

  • New science table tops: order done for replacement over summer 2019

  • Library shelves: new shelving units ordered and will be installed in April

​Completed Projects

  • New media platform installed in gym

  • New stage lights installed in theater

  • Gym A/V system upgraded

  • Security cameras replaced

  • New projectors installed

  • New exterior storage container installed

  • New theater house lighting system installed