Project Details

  • Project Manager: Dan Moors

Scope of Work

Remodels/Additions - $2,075,000

  • Remodel to add auditorium; relocate Challenger Learning Center to the Center for Modern Learning

  • Gymnasium; construct additional storage space for auxiliary gym

Fairness Formula Projects - $1,155,506

The School Site Improvement Committee identified fairness formula projects — a list of recommended projects. The list will be prioritized and completed as budget allows. 

  • Finish installing air conditioning in rooms without

  • Audio / Visual

  • Basketball Backboards - Electric / motorized basketball standards

  • New flooring throughout the building including small gym

  • Furniture, Fixtures, and Equipment

  • Hydration stations to replace drinking fountains

  • New bathroom stalls

  • New window coverings (blinds) throughout the building

Facilities Audit - $60,000

  • ADA access to track and field

Technology Infrastructure

  • Replace hardware that enables wired and wireless connections to the Internet

In Progress

Remodels/Additions

  • Auditorium: Construction documents complete. Work scheduled to begin in summer 2019

  • Entry remodel: Construction documents complete for redesign of existing Challenger Learning Center space to accommodate school admin area. Work scheduled to begin in summer 2019

Fairness Formula

  • Restroom upgrades: Work scheduled to occur over summer 2019

  • Flooring: Work scheduled to occur over summer 2019

​Completed Projects

  • Removed old TVs and installed ceiling mounted projectors in classrooms.

  • ADA access to field complete

  • Replaced hardware that enables wired and wireless connections to the Internet