Project Details
Project Manager: Dan Moors
Project Manager: Dan Moors
Scope of Work
Fairness Formula Projects - $34,492
The School Site Improvement Committee identified fairness formula projects — a list of recommended projects. The list will be prioritized and completed as budget allows.
Exterior Improvements
Fencing - Replace aged fence
Create dedicated library space
Technology Infrastructure
Replace hardware that enables wired and wireless connections to the Internet.
Project Detail
Project Manager: Dan Moors
Scope of Work
Remodels/Additions - $480.000
Remodels / Additions - Construct a student lunchroom
Fairness Formula Projects - $62,924
The School Site Improvement Committee identified fairness formula projects — a list of recommended projects. The list will be prioritized and completed as budget allows.
Flooring - Replace Multipurpose Room flooring and install new bleachers
Furniture, Fixtures, and Equipment - Install turf on the field between AVHS and Bridges
Hydration Stations - Install hydration stations (replace existing drinking fountains)
Renovate basement to create instructional space
Install storage space / lockers for student backpacks
Facilities Audit - $28,000
HVAC Controls - DDC upgrades
Technology Infrastructure
Replace hardware that enables wired and wireless connections to the Internet
In Progress
Remodels / Additions
Lunchroom addition: Design meetings in progress. Work scheduled to begin summer 2019
Facilities Audit
Boiler replacement: Work scheduled to be done over summer 2019